Capital Projects

1) Waukegan High School - Washington Campus

  • 80+ Classrooms: walls, baseboards, & trim-primed/painted
  • 1905 lockers-painted
  • 48 New A/C unit installation(s)
  • 12 Administrative office suites-primed/painted
  • 8 Athletic Offices-primed/painted
  • 2 New windows in room 147
  • 2 New Ticket Booth countertops
  • 1st,2nd,3rd Floor baseboards of entire building-painted
  • 3 Cafeteria(s) area(s)-repaired/primed/painted
  • Cafeteria-New countertop
  • Cafeteria-New tile floor
  • Electrical Wiring and Conduit Installation for 48 New A/C units
  • Library-primed/painted
  • Library-New carpeting
  • New Main Office-primed/painted
  • New Main Office-New carpeting
  • Room 201-New carpeting/primed/painted
  • Teacher Lounge-New carpeting
  • Teacher Lounge-primed/painted
  • Teacher's Cafeteria-primed painted
  • Transformer(for New A/C)-Newly installed
  • Exterior Lighting Upgrades
  • Dog Pound Gym Floor-sanded/restriped/repainted/refinished
  • Dog Pound Improvements
  1. 6 New Backboard Electric Winches
  2. 6 New Backboards/Rims
  3. Athletic Offices-primed/painted
  4. Bannisters-primed/painted
  5. Ceiling Light Enhancements/Replacements
  6. Concession Area-New countertop
  7. Concession Area-primed/painted
  8. Foyer Hall Floors-painted
  9. Foyer Walls & Ceilings-primed/painted
  10. Gym Walls-primed/painted
  11. Hall of Fame Pictures-removed/cleaned/rehung
  12. Hallway Door Frames-primed/painted
  13. Hallways & Ceilings-primed/painted
  14. Jackson Street Door Frames (entrance)-primed/painted
  15. Men's & Women's Restrooms-primed/painted
  16. Stairwell Doors/Door Frames-primed/painted
  17. Stairwell Walls-primed/painted
  18. Stairwell-primed/painted

2) Waukegan High School - Brookside Campus

  • 3074 Student Lockers-painted
  • 1st Floor & West Wing-New Tiled floors
  • 2nd Floor & West Wing-New Tiled floors
  • Cafeteria-primed/painted
  • Monroe St. Parking Lot Patching
  • Principal Office New archway-primed/painted
  • Principal Office-New carpeting
  • Principal Office-New conference room
  • Principal Office-Removal of wall
  • Softball Field Shed-New roof
  • Exterior Lighting Upgrades

3) Weiss Field - Athletics

  • Athletic Track, Long Jump, Football Goal Area-Stripped down
  • Athletic Track, Long Jump, Football Goal Area-6 layers of resurfacing
  • Athletic Track, Long Jump, Football Goal Area-New striping
  • Fieldhouse Roof-Stripped of old Shingles
  • Fieldhouse Roof-New Shingles

4) Andrew Cooke Magnet School

  • 4 Basketball Goalposts-realigned at 90 degrees
  • Fence-painted
  • New Landscaping
  • Newly Installed Main Entrance Restoration
  • Newly Installed Ramp
  • Newly Installed Safety Railing
  • Newly Installed Sidewalk

5) John Clark Elementary School

  • 13 New A/C unit installation(s)
  • Electrical Wiring and Conduit Installation for 13 New A/C units
  • New Roofing Work
  • Exterior Lighting Upgrades

6) Landscaping

  • Throughout District

7) Glen Flora Elementary School

  • Parking Lot-blacktopped/yellow striped
  • Exterior Lighting Upgrades

8) Daniel Webster Middle School

  • Gym Floor-sanded/repainted/restriped/refinished
  • Newly Installed Grease Trap-replacement
  • Newly Installed Check Valve-replacement
  • Exterior Lighting Upgrades

9) North Elementary School

  • 4 Classrooms-Tile removed
  • 4 Classrooms-Wood Floor refinished
  • 8 Classrooms-Newly Tiled floors
  • New Main Office

10) Jefferson Middle School

  • Gym Divider (to be replaced in September 2017)

11) Carman Buckner Elementary School

  • 30 New A/C unit installation(s)
  • Electrical Wiring and Conduit Installation for 30 New A/C units

12) Clearview Elementary School

  • Life Safety A Priority #1-Newly Installed
  • Exterior Lighting Upgrades

13) Glenwood Elementary School

  • Life Safety A Priority #1-Newly Installed
  • Exterior Lighting Upgrades
  • Assistant Principal Office - New Carpet

14) Hyde Park Elementary School

  • 13 New A/C unit installation(s)
  • Electrical Wiring and Conduit Installation for 13 New A/C units
  • Parking Lot-Striping
  • Exterior Lighting Upgrades

15) Little Fort Elementary School

  • 26 New A/C unit installation(s)
  • Electrical Wiring and Conduit Installation for 26 New A/C units
  • Exterior Lighting Upgrades

16) H. R. McCall Elementary School

  • 10 New A/C unit installation(s)
  • Electrical Wiring and Conduit Installation for 10 New A/C units
  • Life Safety A Priority #1-Newly Installed
  • Exterior Lighting Upgrades

17) Oakdale Elementary School

  • Life Safety A Priority #1-Newly Installed
  • Exterior Lighting Upgrades

18) Washington Elementary School

  • 7 New A/C unit installation(s)
  • Electrical Wiring and Conduit Installation for 7 New A/C units

19) Whittier Elementary School

  • Life Safety A Priority #1-Newly Installed
  • Exterior Lighting Upgrades

20) Greenwood Elementary School

  • 2 Bottle Filler Water Fountains - Room 4B & New Addition
  • Teachers' Lounge - New Carpet
  • Teachers' Lounge - Painted
  • Exterior Lighting Upgrades

21) Jack Benny Middle School

  • Interior Lighting Upgrades
  • Student Locker Painting
  • Exterior Lighting Upgrades

22) Robbie M. Lightfoot Early Learning Center

  • Exterior Lighting Upgrades

23) Robert Abbott Middle School

  • Exterior Lighting Upgrades

24) Volunteer Projects

  • Chicago Cares-Whittier Elementary School
  1. Exterior Beautification-painted
  2. New Wood Benches-built
  3. Interior-primed/painted
  • United Way-Lyon Magnet Elementary School
  1. Created a Peace Room in room 5
  2. Baxter-Glenwood Elementary School
  3. Exterior Beautification
25) 
  • Brookside Campus - fire alarm replacement, domestic water heater replacement and kitchen hood vents, rooftop air handler replacement with ceiling replacement, and new lighting.
  • Glenwood, John Clark, Little Fort, McCall, Oakdale, Greenwood, Robert Abbott, and Carman-Buckner are receiving new main entry secure entrances.
  • Glenwood, Andrew Cooke, Jack Benny, North, and Hyde Park are having the parking lots replaced.
  • Robert Abbott will have work performed on the retaining wall and the ramp will be repaved. AOEC is having some tuckpointing and new fire escapes installed. ESSER 3 work includes work to be performed at Glenwood gymnasium for cooling the space.
  • Little Fort is receiving new uni-vents in the east cluster.  John Clark will be receiving a new rooftop unit for heating and cooling in the gymnasium and an electrical service upgrade.
  • Washington Campus is receiving a rooftop unit for cooling in the cafeteria.  Andrew Cooke is receiving a new rooftop unit to heat and cool in the multi-purpose room.
  • Brookside Campus will be receiving cooling in the cafeterias. 
  • The Pathways Program classroom is on the schedule for Washington Campus. This program is for those students interested in getting into the HVAC field. The room will have several pieces of equipment for the students to learn on.
  • IT closets and IDF rooms will be receiving new ventilation and cooling included in this scope of work. This will be a multiple-site project, districtwide.
  • AV equipment is in the works to be installed at 14 sites.
  • An outdoor classroom at Washington Campus